top of page
The Buccaneer
The scope of work involved installing a new one-inch standing seam metal roof system at the front entry of a building in three sections (North, South, and Middle). The metal roofing material was be made of .032 aluminum and colored "Regal Blue." The project included all necessary accessories to ensure the roof system is fully code-approved.
Contact
Send us a message, and we will contact you to arrange a free consultation:
bottom of page